Chrysler’s Windsor Assembly Plant to shut down for five weeks for air bag update

Chrysler's Windsor Assembly Plant to shut down for five weeks for air bag update
New Air Bag Rules In US Shuts Down WAP Temporarily
Chrysler's Windsor Assembly Plant is shutting down for five weeks in October and November to ensure the Dodge Caravans are outfitted with airbags that meet new U.S. regulations. "We don't put in the new style airbag to meet the U.S. specs until

Chrysler's Windsor Assembly Plant will shut down for five weeks this fall to upgrade the airbags installed in Dodge Caravans so that they meet U.S. standards. The plant will be closed for all of October and the first week of November. Until the airbags …

New Air Bag Rules In US Shuts Down WAP Temporarily

There is word Windsor Assembly Plant will shut down for a total of five weeks this fall for retooling because of new legislation in the U.S. governing airbags. Unifor Local 444 President, James Stewart says the Chrysler Pacifica was designed to the new

Six thousand Windsor workers, plus thousands more at feeder plants, will be off work this fall because the Dodge Grand Caravan needs to be re-designed. Unifor Local 444 president James Stewart tells AM800 the shutdown is still “tentative” in terms of …

Windsor at Twitter: